Meanwhile back at the plant
I spent the day at the plant in Bellmawr.
I unpacked and deployed 5 machines which I had configured in Salem.
I configured 2 other computers.
I set up 3 printers.
I moved a dozen patch cables in the network rack from the BOC router to
the Airgas router.
The cat5 tester Phil gave me a while back proved invaluable. Some
of the ports were not labelled accurately, and the patch panel had two
banks of numbers 1 - 8.